Why November is the time to book your Christmas shutdown works

For many organisations the Christmas shutdown is the only point in the year when the building is genuinely empty. Offices close, production stops and the phones go quiet for a week or more. For infrastructure work that needs the power off, systems down or a floor cleared, it is the most valuable window you will get.

It is also the window everyone else wants. Contractor diaries for the last two weeks of December fill up during November, and equipment such as cabinets, switches and fibre can carry lead times of several weeks. If you want work done over the break, now is the time to book it.

What suits a Christmas shutdown

The best candidates are jobs that cannot happen with people in the building, or that would cause days of disruption if they did. These are the five we are asked about most.

1. Comms room and cabinet rebuilds

Re-racking a cabinet, replacing patch panels or rebuilding a comms room means taking the network down. Over a normal weekend there is rarely time to do it properly, test everything and recover from anything unexpected. Over the Christmas shutdown there is.

2. Recabling a floor or a building

Recabling an occupied floor means working around desks, people and meetings, often at night. An empty building lets the whole floor be done in one pass, tested end to end and handed over with complete records. We cover what those records should include in what you should receive when a cabling installation is handed over.

3. Core switch and backbone upgrades

Replacing core switches or the fibre backbone between floors or buildings affects everyone at once. Doing it while nobody is working means any issues are found and resolved before staff return, rather than on the first morning back.

4. Electrical work that needs the power off

Distribution board replacements, new submains, dedicated supplies for comms rooms and UPS installations all need circuits isolated. Periodic inspection and testing also needs isolation at points, which is why many sites use the shutdown for their EICR. NICEIC has a useful summary of how EICRs have changed this year. Work carried out from 15 October onwards is to BS 7671 Amendment 4, so make sure your contractor is working to it.

5. Security system changes

Moving or adding cameras, replacing a recorder or changing access control is simpler when the building is locked and quiet. The one caution is that an empty building is also a target, so the work needs planning so that the site is never left without working cameras overnight. Done well, it means the system is fully tested before the site reopens.

How to prepare

Book the survey in November. It lets the scope be fixed, equipment ordered and the programme agreed before the break rather than during it.

Agree access early. Decide who will open the building, which areas are available and who can sign off permits or isolations if they are needed over the holiday.

Plan the return. Decide what needs to be confirmed working on the first morning back, from phones and Wi-Fi to door access and cameras, and who will check it.

Get the paperwork at handover, not in January. Test results, certificates and as-installed records should be complete when the work finishes. For new cabling, that includes the registration for any manufacturer warranty.

Plan your Christmas shutdown works with one team

We deliver data cabling, networking, telecoms, security and electrical work, so a single Christmas shutdown programme can cover all of it with one accountable team and one set of paperwork. Every installation is tested and certified before we leave site. If you have work that needs an empty building, talk to us about a survey this month.

Leave a Reply

Your email address will not be published. Required fields are marked *

Award-winning work

  • Winner 2025

    Subcontractor of the Year

    Robertson Engineering Services Subcontractor of the Year 2025, awarded by Robertson Group.

  • Award winner

    Northumbrian Water Group award

    Shared with Esh Construction and Virgin Media O2 for delivering site-wide Wi-Fi to every lodge and building at Kielder Waterside.

    See the project
  • Finalist

    Top 5, Project of the Year

    Northumbrian Water Group Project of the Year, for the Kielder Waterside Wi-Fi project.

    See the project

Terms & Conditions | Privacy Policy © 2026 Multiconnect Communication Services Ltd | Registered Company Number: 09523974

Website by One Design Group