For a lot of organisations, November is when next year’s budget takes shape. Estates, facilities and IT teams are asked what they will need, and the infrastructure that sits in ceilings, walls and comms rooms is easy to leave off the list because, when it works, nobody sees it.
The trouble is that infrastructure rarely fails on a timetable. A switch that drops out of support, a wireless network that can no longer cope or an inspection that turns up remedial work all become unplanned spend if nobody has looked ahead. Here are five costs worth thinking about before the infrastructure budget is signed off.
1. Wireless that has reached its limit
Most Wi-Fi complaints have the same root cause: more devices, heavier use and access points that were specified for a different building or a different way of working. Newer access points are faster, but they also draw more power over the data cable and increasingly need multi-gigabit uplinks to deliver that speed.
If a Wi-Fi refresh is likely in the next year, budget for the cabling behind it as well as the hardware. Putting new access points on tired cabling is one of the most common reasons an upgrade underperforms, as we explained when we looked at planning a school network upgrade.
2. Switches and network hardware going out of support
Network switches tend to keep working long after the manufacturer stops issuing firmware and security updates. A switch past its end of support date is a security risk as well as a reliability one, and replacing a core switch in a hurry after a failure is always more expensive than doing it on your own schedule.
List the make, model and age of every switch and firewall, check the manufacturers’ end of life dates and budget for anything that falls inside the next 18 months. While you are at it, check whether the existing switches can supply the power that new cameras and access points will need.
3. Cabling that is being asked to do more
Category 5e cabling installed 10 or 15 years ago may still carry data perfectly well. What has changed is what it is being asked to carry. Power over Ethernet now delivers up to 90 watts a port to cameras, access points and phones, and that power turns into heat inside cable bundles. Our article on why cameras keep dropping out explains how that leads to intermittent faults.
If you are adding devices, reorganising a floor or extending a building, a survey of the existing cabling will tell you whether it can take the load or whether a partial recable belongs in the budget. A new installation registered under a manufacturer’s scheme also comes with long term cover, which we explain in what a 25 year cabling warranty actually covers.
4. Electrical inspection and remedial work
If your Electrical Installation Condition Report falls due next year, budget for the inspection and a sensible allowance for any remedial work it turns up. Reports are now carried out to BS 7671 Amendment 4, which brings data cabling that carries power within the scope of the Wiring Regulations. Our guide to BS 7671 Amendment 4 covers what has changed.
Larger electrical jobs, such as new distribution boards, dedicated circuits for a comms room or a UPS, also need lead time. Pricing them now means they can be planned properly rather than squeezed in when they become urgent.
5. Anything still on an analogue line
The analogue telephone network is being switched off on 31 January 2027. Phone lines are the obvious part, but lift emergency phones, alarm signalling, door entry and older card terminals can also depend on copper lines that were installed years ago and forgotten about. Openreach has said that business lines still on the old network at the deadline will not get the temporary protection that home phone users will.
Find out what is still connected to an analogue line and budget for moving it before the end of January, not after.
How to build the list
An infrastructure budget is only as good as the information behind it. Before you finalise the numbers, ask for:
- an up to date record of switches, firewalls, access points and cameras, with their ages
- the test results from your last cabling installation
- the date and outcome of your last EICR
- a list of every service that uses a phone line, including lifts and alarms
If those records do not exist, a site survey will produce them. It is usually a small cost compared with the work it helps you avoid or plan properly.
Planning your infrastructure budget with one team
We cover data cabling, networking, telecoms, security and electrical work, so a single survey can look at everything above and give you one clear picture of what needs doing this year and what can wait. Every installation is tested, labelled and documented before handover, with one accountable team from survey to sign-off.
If you are putting next year’s budget together, talk to us about a survey and we will help you prioritise the spend.