Planning a school network upgrade around half term and the DfE standards

For most schools and colleges, October half term is the first chance of the academic year to get into classrooms without pupils in them. If a school network upgrade is on the list for this year, the week is useful in its own right. It is also the right moment to plan the larger work that needs the Christmas break or the summer holiday.

The planning looks different now than it did a few years ago, because the Department for Education has set out what good looks like.

The DfE digital and technology standards

The DfE expects schools and colleges in England to meet six core digital and technology standards by 2030. Three of them are about infrastructure: broadband internet, the wireless network and network switching. The rest deal with cyber security, online safety filtering and how digital decisions are governed.

Network cabling has its own standard alongside these. It is not one of the six core standards, but it underpins two of them, because a wireless network and its switches are only as good as the cabling that connects them.

What the cabling standard asks for

The DfE network cabling standard is specific. Copper cabling should be Category 6A. Connections between buildings should use OM4 optical fibre, ideally run in underground ducts, with redundant fibre routes considered for critical systems. All cabling should comply with BS 6701, BS EN 50173 and BS EN 50174, which cover how cabling is specified, installed, operated and maintained, and cable runs should not include intermediate splices or patch panels.

The standard also says when it applies: when you replace a cabling system that is underperforming, in new building projects and when you upgrade your wireless network.

Why the Wi-Fi refresh is usually the trigger

That last point is the one that catches schools out. A wireless upgrade is often scoped as an equipment project, new access points and a new controller, with the existing cabling assumed to be fine. Under the DfE guidance, the upgrade is the point at which the cabling is expected to meet the standard as well.

There is a practical reason for it. Current access points draw more power over the data cable than older models and increasingly use multi-gigabit uplinks, which Category 6A is designed to carry over a full 90 metre run. Putting new access points on tired cabling is one of the most common reasons a school network upgrade underperforms. It also means the cabling is carrying power as well as data, which now brings it within the scope of the Wiring Regulations, as we explained in our piece on BS 7671 Amendment 4.

What fits into a half term

A week is enough for a surprising amount if the survey and design are done beforehand. Individual blocks or departments, new wireless access point positions, a comms cabinet tidy and re-patch or new fibre between two buildings can all realistically be installed and tested in half term.

A whole-site recable is different. That is normally best phased across Christmas, Easter and the summer, with the survey and design completed in the autumn term so that each phase starts on the first day of the holiday rather than a week into it.

Surveys can happen during term time with very little disruption. It is the installation that needs an empty building, so the sooner the survey is booked, the more of each holiday can be used.

Questions to ask before you commit

Will the new cabling be Category 6A, and will the fibre between buildings be OM4? If not, ask why, and get the answer in writing for your governors or trust.

Will every link be tested, and will the installation be registered under a manufacturer warranty? We explain what a genuine warranty involves in what a 25 year cabling warranty actually covers.

What documentation will you receive at handover? Test results, labelling and as-installed records are what make the network maintainable after the installer leaves. There is more on this in what you should receive when a cabling installation is handed over.

Has the design allowed for the power the new access points will draw, and for the switches that will supply it?

Planning your school network upgrade

We work across education, the public sector and other environments where the building cannot stop while we work in it. We plan around term dates from the survey onwards, and every installation is tested, labelled and documented before handover, with one accountable team from survey to sign-off.

If you are planning a school network upgrade this academic year, talk to us about a survey and we will help you phase the work around your holidays.

Leave a Reply

Your email address will not be published. Required fields are marked *

Award-winning work

  • Winner 2025

    Subcontractor of the Year

    Robertson Engineering Services Subcontractor of the Year 2025, awarded by Robertson Group.

  • Award winner

    Northumbrian Water Group award

    Shared with Esh Construction and Virgin Media O2 for delivering site-wide Wi-Fi to every lodge and building at Kielder Waterside.

    See the project
  • Finalist

    Top 5, Project of the Year

    Northumbrian Water Group Project of the Year, for the Kielder Waterside Wi-Fi project.

    See the project

Terms & Conditions | Privacy Policy © 2026 Multiconnect Communication Services Ltd | Registered Company Number: 09523974

Website by One Design Group